1.

Bldg. 378 Chilled Water System for Fleet Readiness Center Southwest

  • Client: NAVFAC Southwest

  • Location: Coronado, CA

  • Year Completed: 2023

  • Contracted Amount: $1,369,679

  • Overview: The project scope at the Fleet Readiness Center Southwest (FRCSW) included the delivery, positioning, connection, start-up, validation, acceptance, calibration, and training for a new chilled water system. For the generator rework complex in Building 378, we installed a new chilled water system. Paradigm relocated two existing chillers and procured and installed two new Carrier chillers, a water storage tank, ten new pumps, piping, and electrical upgrades. Finally, we poured new concrete equipment pads and applied new floor epoxy.